Industrial
Baykal Machinery Factory & Headquarters
- Client
- Baykal Makina
- Year
- 2028
- Location
- Bursa, Türkiye
- Area
- 65,000 m²
- Status
- Under Construction
The project rethinks the relationship between production and administration within a large-scale industrial facility. Rather than locating the office and visitor functions at the perimeter, they are placed at the centre of the factory, creating equal and direct access to every production area while establishing the administrative core as the organisational heart of the complex.
This central intervention defines both circulation and spatial organisation. The depth of the production halls became an opportunity to introduce daylight and natural ventilation through the roof rather than the façade, bringing natural light deep into the building while enhancing environmental performance and the quality of the working environment.
The resulting composition establishes a clear relationship between production, administration, and visitors, expressing an industrial architecture shaped by operational efficiency, environmental performance, and spatial clarity.
01 / 04
- Design Team
- Kerem C. AKINBengisu TOPANOGLUSevval DIKDURAKSerra SAKALLIOĞLU
- Visualization
- KAPlatform